From Winter to Winter
The director of a metallurgical plant receives a task from the ministry: in a short period of time (from winter to winter) to master the production of a new grade of steel necessary for the construction of a gas pipeline in the Far North. The plant team, under the guidance of a professional, successfully solves technological problems and completes the task.